At the end of 2018, a new sewage plant with a capacity of 1.2 million PE is to commence operations. It will be 600 metres long and 130 metres wide. In normal operational mode it will handle around 4.1 cubic metres of waste water per second, equivalent to 15 million litres per hour.
Construction of this sewage plant commenced in October 2015. The plant was designed to minimise space requirement. Both chemical and energy consumption were sufficiently optimised to fulfil the strict EU regulations regarding water quality that must be implemented by 2021. This would not have been possible with the previous sewage plant.
Go to 2/2